LAR IH 1.3 (Krem)

(Umrangso - IN)
25.439000,92.612900
Grottocenter / carte

Description

Herbert Daniel Gebauer - 06/01/2018

A 4 m wide vertical cave entrance (pothole) descends 5 m or 6 m down into the southern Entrance 3 to Krem Lar Ih 1 (Arbenz T 2011.08.20 LahrIh1plan.pdf). SITUATION: In an unspecified spatial relation to the northern Entrance 1 (Arbenz T 2011.08.20 LahrIh1plan.pdf), which is said to lie near N25°26'19.9”: E092°36'56.6”: 757 m asl (Kharpran Daly, B D 2011.02.22 capricious 4-channel GPS Magellan) and at a linear distance of either 125 m SSE (-120 m north, 9 m east) near N25°26'14”: E092°36'58” (Arbenz, T 2013.03.16 Pala relief13 2.pdf; Arbenz T 2011.08.20 LahrIh1plan.pdf) or280 m west (15.5 m north, -280 m east) according to the recorded GPS position of N25°26.20.4”: 092°36’46.6” [unspecified precision error, unidentified geodetic datum perhaps WGS84] (Arbenz, T 2011.03.27 Mss: Brian K. Daly 23st Feb. 2011 Krem Lar Ih 1, 22.2.2011). CAVE DESCRIPTION: An exit in an open pit (w4m x h7m) (Arbenz, T 2011.03.27 Mss: Brian K. Daly 23st Feb. 2011 Krem Lar Ih 1, 22.2.2011) at an unidentiied elevation 9 m higher up than the Entrance 1 (survey data). TACKLE: 5 m ladder if entry is planned through the pitches at either end (Arbenz, T 2011.03.27 Mss: Brian K. Daly 23st Feb. 2011 Krem Lar Ih 1, 22.2.2011).

Documents

Bibliography 06/01/2018

Histoire

EXPLORATION HISTORY: 2011.02.23: Cdr. Vijay Chhikara and Oana Chachula … continued exploring about 13 new stations and reached the second entrance (Arbenz, T. et al. 2011.03.27 undated Mss: 2011 Diary.doc: Wednesday 23rd February). On the other hand, we are told that the cave survey commenced seven days after its closure: 22nd Feb 2011: V. Chhikara, BK Daly, O. Chachula, guide Mynlin Manar. Started the Survey (250 m) 15th Feb 2011: V. Chhikara, BK Daly, O. Chachula finished the survey (99 m) (Arbenz, T 2011.03.27 Mss: Brian K. Daly 23st Feb. 2011 Krem Lar Ih 1, 22.2.2011). Herbert Daniel Gebauer - 06/01/2018

Cavités proche

Distance (km)NomLongueur (m)Profondeur (m)
0.0LAR IH 2 (Krem)
0.3LAR IH 1 (Krem)
0.3LAR IH 1.2 (Krem)
0.7Um u Siar 2 (Krem)
0.7UM U SIAR 1 (Krem)
0.7UM U SIAR 4 (Krem)
0.8UM U SIAR 3 (Krem)
1.0KOPILI INLET TWO
1.2AA CAVE (Arbenz 2010.02.14)